This is the second contract that E.ON signs with Liquiline and, as with the first one, Liquiline’s gas will be supplied and stored as liquid natural gas (LNG) or liquefied biogas (LBG) at a temperature of -160°C, and will then be converted into high pressure compressed gas with a pressure of 250-300 barg before use.
“It is a great pleasure to receive yet another order from such a large and reputable company as E.ON. We are still in the building phase of the first station and we have already received confidence to also supply E.ON’s next LCNG gas filling station,” said Dag Lilletvedt, Liquiline’s CEO. Stiklo pertvaros https://www.beremisstiklas.lt/pertvaros-ir-dusai/
In addition to this new contract with E.ON Biofor Sverige AB, the technical solution on the first station has been slightly modified in order to make the two stations basically similar and to further increase the possibility of redundancy, high uptime and ease of operation.
Source: Liquiline